Golden Gate Bridge West Side Reopened!


Jon and Miko Like Totally Pause Near Fort Point

On September 10, 2011 the West Side of the Golden Gate Bridge reopened to bicyclists. The West Side of the bridge will now be open 24/7 until seismic renovations are completed on the East Side of the Bridge. However, there are some restrictions on bikers during the week in the construction zone where the repainting is occuring. See the release for full details.

The East Side of the Bridge has limited access until mid-January 2012

As of September 12, 2011 pedestrians are unable to walk across the Golden Gate Bridge. Presently, pedestrians entering from Vista Point in Marin County are limited to the area immediately surrounding Vista Point and a 700 foot section of the Bridge. The renovations will be at the north anchor-housing and will last through mid-January 2012. Visitors from the San Francisco side of the Bridge are able to walk past the second tower, but must turn around at that point.

BIKES ONLY on the West Side! NO Pedestrians, Joggers, Rollerbladers or Skateboarders!

This effectively means that pedestrians, joggers, skateboarders and everyone else, EXCEPT bicyclists WILL NOT be able to cross the Bridge until it reopens in mid-January 2012. If you are a jogger and feel you should be able to run on the bike side of the bridge, DON’T! Bridge Police will be out and cite pedestrians trying to cross on the West Side of the Bridge. So if you want to walk to Sausalito, you will have to park in Marin County to do so.

Although tempting, pedestrians are not to ender the West Side of the Bridge

Bicyclists, you can now rejoice in the fact we can once again ride across the bridge without dealing with pedestrians. So don’t be bike douches, just slow down around the towers and in the construction zone because we all paused for pictures on the Golden Gate Bridge at one point in time and may do so once again.

Miko pauses for a picture at the south tower on the West Side

Bike4Breath Update — Training Ride and Routes


As Bike4Breath approaches we here at Team WeLikeToBike are getting ready for our 100k ride.  Part of getting ready for the ride is knowing the route and the total ascent we will encounter.

Distance from Life Technologies: 60.3 miles

Total Ascent: 1,532 feet (467 meters)

Difficulty: A few tough climbs with a lot of rolling hills and flats.

The route through the Peninsula will take us by the Bay on a bike path, over US-101, through neighborhoods, past Crystal Springs Reservoir and through parts of the Stanford University campus.

Team WeLikeToBike is getting ready for this ride in our local area over the next couple of weeks by training after work with 50k rides and full 100k rides over the weekend.

You can use a program like Map My Ride or Bike Route Toaster to plan and view your training route, the climbs and get a printout of the directions for your ride. We use a Garmin Edge 800 to keep us on track and record the route as we ride.

We’ll make sure to post a re-cap after the event.